Cimarron Ag Systems. Automation, Controls, Electrical.

Project Types

Your next project
starts with the problem.

You don’t need a technical name for the job. Explore a few practical starting points, then tell us what you need your operation to do.

New systems, existing-system upgrades, and troubleshooting. The approach follows the equipment, the operating needs, and the scope of your project.

01

Pump & Irrigation Controls

A pump needs to start and stop under the right conditions, or irrigation controls need attention. Begin with the equipment and how it should operate.

Discuss Pump Controls
  • Pump & Motor Controls
  • Operating Conditions
  • Controls Troubleshooting
02

Improve Existing Controls

A setup has become awkward to operate, controls need updating, or equipment is changing. Work through the existing system and what needs to improve.

Discuss an Upgrade
  • Existing-System Review
  • Control Panels & Drives
  • Operator Screens
03

Automate a Repeated Task

A job involves repeated manual steps, or pieces of equipment need a clearer handoff. Define the sequence before choosing the controls.

Discuss Automation
  • PLC Programming
  • Equipment Coordination
  • Commissioning
04

Understand What Is Happening

People need a clearer view of system conditions or a more usable way to operate the equipment. Discuss the information and controls needed for the job.

Discuss Operator Controls
  • HMI / SCADA
  • Operator Information
  • Control Logic
05

Find What Is Not Working

Equipment does not start, a control behaves unexpectedly, or a sequence is no longer doing what it should. Start with the symptoms and what changed.

Describe the Problem
  • Controls Troubleshooting
  • Electrical Connections
  • Operating Sequences

You bring the problem.
We work through the scope.

The first discussion can be straightforward: what do you have, what is it doing, and what would you like it to do?

01

Start With the Job

What should happen, what is happening now, and what would make the work easier? You don’t need to know the technical answer.

02

Work Through the System

Look at the equipment, controls, operator interface, and electrical connections together. Agree on the scope before moving ahead.

03

Put It Into Operation

Programming, commissioning, and troubleshooting focus on the intended sequence and how the system is used day to day.

Tell Us What Needs to Work Better.

One pump, a troublesome control, or a bigger project. Start with the job you need done.

Let’s Talk About It